Arrangement of construction joints in cast-in-place slabs
Within latest decades cast-in-place construction of residential houses has been actively developed.Works on erection of cast-in-place frame of the building are normally performed by phases, which results in a necessity to arrange construction joints of concreting.In accordance with regulatory documents, it is allowed to arrange construction joints